the pre-installation phase requires careful planning to ensure a smooth delivery and installation.
Pre-Installation Phase
-------------------
Before the installation team arrives several preparation activities take place at the manufacturing facility. These include:
- Visual inspections to ensure the windows are free from defects and potential harm
- Storage and displays measures to avoid damage during transportation
- Distribution of installation materials, such as insulation, flashing, and sealants
- Communication with the installation team to schedule the delivery and installation
---------------------------
Upon arrival on-site, the installation team begins by conducting a site survey to assess the installation area. This requires:
- Measuring the opening and verifying it is exact
- Confirming the surrounding areas are clear of debris and hazards
- Checking for any obstacles that may hinder the installation process
- Confirming the kind of frame system being used to confirm correct fit
------------------------
Before the new window can be installed, the old window must be removed. This is typically:
- Prising the old window out of the frame using a careful prying motion
- Disconnecting
- Removing potential flashing or sealants around the old window
- Preparing the frame for the new window
---------------------
The installation team then prepares the frame for the new window by:
- Cleaning the area to ensure a smooth seal
- Applying flashing around the frame to avoid water ingress
- Applying primer or specialized coatings to the frame for sealing
- Installing a sealant or weather-tightening system around the frame
---------------------------
The new window is then carefully placed into the prepared frame. This involves:
- Confirming the window is properly aligned with the frame
- Applying shims and wedges to adjust for potential irregularities
- Tapping the window gently into position to secure it
- Securing any screws or bolts to ensure a secure fit
----------------------------
Once the window is installed, the installation team conducts a series of checks and inspections to guarantee the window is functioning as intended. This includes:
- Testing the window for proper operation and balance
- Inspecting the sealant and flashing for any gaps or инверторные кондиционеры indications of compromise
- Inspecting for proper thermal efficiency and performance
- Documenting the installation process and keeping a record for future reference

댓글 달기 WYSIWYG 사용